2021 Model Year Final Fleet Order Dates
Stellantis
Dodge
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
Challenger |
08/05/21 |
|
Charger |
08/05/21 |
|
Charger Pursuit |
08/05/21 |
|
Durango |
04/08/21 |
|
Ram
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
ProMaster City |
04/08/21 |
|
ProMaster |
12/28/20 |
11/13/21 |
1500 Regular Cab
Pickup (DS) |
04/08/21 |
|
1500 Quad Cab, Crew
Cab Pickup (DS) |
04/08/21 |
|
1500 (DT) |
03/01/21 |
|
2500 Pickup (DJ) |
03/01/21 |
|
3500 Pickup (D2) |
03/01/21 |
|
3500 Chassis Cab
(DD/DF) |
03/01/21 |
|
4500, 5500 Chassis Cab
(DP) |
03/01/21 |
|
Chrysler
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
300 |
08/05/21 |
|
Pacifica |
04/08/21 |
|
Voyager |
04/08/21 |
|
Jeep
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
Renegade |
TBD |
|
Compass |
03/04/21 |
|
Cherokee |
04/08/21 |
|
Wrangler |
04/08/21 |
|
Gladiator |
04/08/21 |
|
Grand Cherokee |
04/08/21 |
|
Fiat
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
500 |
TBD |
|
500X |
TBD |
|
To
ensure consideration for production,
orders must be placed in the FCA Order System by the above mentioned dates.
FCA cannot guarantee production of
orders received by FCA after the order cutoff date. All dates are subject to
revision by FCA.
Final Fleet Order Date and Plant Build-Out Date updated 02/25/21
Ford Motor Company
Ford
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
Mustang |
|
|
Fusion |
|
|
Fusion Police |
|
|
Police Interceptor
Utility |
|
|
Police Utility
Interceptor - VSO |
|
|
Edge |
|
|
EcoSport |
|
|
Escape |
04/30/21 |
08/13/21 |
Explorer |
|
|
Expedition |
|
|
Econoline |
10/09/20 |
12/23/20 |
Transit Connect |
12/18/20 |
04/16/21 |
Transit |
04/30/21 |
TBD |
Ranger |
|
|
F-150 - Dearborn, MI F-150 - Kansas City,
MO |
|
|
F-150 - VSO Orders |
|
|
F-Series Super Duty -
Louisville, KY F-Series Super Duty -
Avon Lake, OH |
01/20/21 01/20/21 |
05/30/21 06/14/21 |
F-Series Super Duty -
VSO |
01/19/21 |
04/26/21 |
F-Series Medium Duty |
10/23/20 |
12/23/20 |
Lincoln
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
MKZ |
|
|
Continental |
|
|
Aviator |
03/05/21 |
05/30/21 |
Corsair |
04/30/21 |
08/13/21 |
Nautilus |
|
|
Navigator |
|
|
All dates
are subject to change. Selected options may balance out earlier than reflected
above due to high demand and/or commodity shortage.
Although it
is unlikely that orders received after the above dates will be produced, Ford
will attempt to accommodate as many as possible. However,
acceptance
of an order is not a production commitment.
Final Fleet Order Date and Plant Build-Out Date updated 03/05/21
General Motors Company
Buick
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
Encore |
12/17/20 |
04/03/21 |
Encore GX |
12/17/20 |
04/03/21 |
Envision |
01/12/21 |
07/02/21 |
Enclave |
04/22/21 |
07/30/21 |
Cadillac
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
CT4 |
01/12/21 |
07/29/21 |
CT5 |
01/12/21 |
07/29/21 |
XT4 |
01/12/21 |
06/04/21 |
XT5 |
01/12/21 |
06/12/21 |
XT6 |
01/12/21 |
06/12/21 |
Escalade |
05/20/21 |
10/01/21 |
Chevrolet
Model |
Final
Fleet Order Date |
Plant
Build-Out Date |
Spark |
01/12/21 |
06/04/21 |
Bolt EV |
12/17/20 |
TBD |
Malibu |
01/12/21 |
06/18/21 |
Camaro |
01/12/21 |
06/10/21 |
Corvette |
10/29/20 |
TBD |
Trax |
12/17/20 |
04/03/21 |
Trailblazer |
12/17/20 |
04/03/21 |
Equinox |
01/12/20 |
06/11/21 |
Blazer |
01/12/20 |
07/10/21 |
Traverse |
04/01/21 |
07/30/21 |
Colorado |
12/17/20 |
TBD |
Silverado 1500 LD Regular
Cab |
01/01/21 |
09/18/21 |
Silverado 1500 LD
Double Cab |
01/01/21 |
09/24/21 |
Silverado 1500 LD Crew
Cab |
01/01/21 |
09/24/21 |
Silverado 2500/3500 HD
Regular Cab |
01/01/21 |
07/10/21 |
Silverado 2500/3500 HD
Double Cab |
01/01/21 |
07/10/21 |
Silverado 2500/3500 HD
Crew Cab |
01/01/21 |
07/10/21 |
Silverado Medium Duty |
08/26/21 |
12/23/21 |
Low Cab Forward
3500/4500 - Gas |
02/21/21 |
TBD |
Low Cab Forward 4500
HD/XD &5500 HD/XD - Diesel |
09/15/20 |
01/05/21 |
Low Cab Forward 6500XD
- Diesel |
09/30/21 |
03/31/21 |
Express Cargo* |
01/01/21 |
09/03/21 |
Express Cutaway* |
01/01/21 |
09/03/21 |
Express Passenger* |
01/01/21 |
09/03/21 |
Tahoe |
01/23/21 |
10/01/21 |
Tahoe Police |
01/23/21 |
10/01/21 |
Suburban |
05/06/21 |
10/01/21 |
*the 6.8
liter V8 is constrained to 0% for Express
Cargo, Express Cutaway and Express Passenger Van. Only
Express Vans with the LV1 4.3 Liter V6 are being built for the 2021MY.
GMC Truck
Final Fleet Order Date |
Plant Build-Out Date |
|
Terrain |
01/12/21 |
06/10/21 |
Acadia |
01/12/21 |
06/12/21 |
Canyon |
12/17/20 |
05/28/21 |
Sierra 1500 LD Regular Cab |
01/01/21 |
09/18/21 |
Sierra 1500 LD Double Cab |
01/01/21 |
09/24/21 |
Sierra 1500 LD Crew Cab |
01/01/21 |
09/24/21 |
Sierra 2500/3500 HD Regular Cab |
01/01/21 |
07/10/21 |
Sierra 2500/3500 HD Double Cab |
01/01/21 |
07/10/21 |
Sierra 2500/3500 HD Crew Cab |
01/01/21 |
07/10/21 |
Savana Cargo* |
01/01/21 |
09/03/21 |
Savana Cutaway* |
01/01/21 |
09/03/21 |
Savana Passenger* |
01/01/21 |
09/03/21 |
Yukon |
05/06/21 |
10/01/21 |
Yukon XL |
05/06/21 |
10/01/21 |
*the 6.8 Liter V8 is
constrained to 0% for Savana Cargo, Savana
Cutaway and Savana Passenger Van. Only Savana Vans with the LV1 4.3 Liter V6
are being built for the 2021MY.
Final Fleet
Order Date and Plant Build-Out Date updated 02/19/21